  1. 1 Remove the bolts that secure the BEL 290 to the shipping base.
    • 1 Remove the bolts that secure the BEL 290 to the shipping base.

    • 2 Use a forklift to move the machine off its base, with wooden blocks between the forks and the frame.

    • 3 While the machine is elevated, install the footpad extensions or castor extensions to the bottom of each leg and adjust them for the desired operating height.

    • 4 Position the BEL 290 where it is to be used.

    • When selecting the machine location, carefully consider the following points:

    • Adequate access around the machine for correct operation and service.

    • Sufficient room to open the access doors (including control enclosure).

    • A minimum 3-foot clearance in front of the main electrical enclosure.

    • Sufficient clearance for magazine width increases that occur when the machine is set up for large cases.

    • Easy lift-truck access.

    • Good access for magazine loading and nearby space for pallet loads of flat cases

    • Note that the bi-fold doors jut out further when the ā€˜Cā€™ adjustment is shortened for shorter cases. This increase in machine width should be taken into consideration while ensuring easy access for magazine loading.

    • 1 Set the BEL 290 for maximum Dimension ā€˜Cā€™ (with the magazine in the maximum rearward position).

    • 2 Use at least a two-foot carpenter level, marked on one end so that you always work to the same bubble line and with the concave side down (if there is one).

    • 3 Open the bi-fold door, and position the spirit level along the length of the main frame to level one side of the BEL 290.

    • 4 Adjust the machine leveling feet on this side of the machine as appropriate to centralize the bubble between the parallel lines.

    • 5 Position the spirit level on the main frame along the width of the machine at the discharge end.

    • 6 Adjust the machine leveling feet under the magazine and discharge ends on the opposite side in order to centralize the bubble between the parallels. Tighten the level adjuster lock nuts.

    • 7 Position the spirit level on the main frame along the width of machine at the infeed end and repeat step 6. Finally, anchor the BEL 290 to the floor.

    • If PHSR guarding is installed, the bottom of the guarding should be no more than 6 inches away from the floor.

    • The hot melt system should be mounted on a freestanding table. The electrical power, pneumatic air supply, and insulated adhesive hose need to be connected.

    • Refer to the separate Hot Melt System Manual for further details on installing and setting up the hot melt tank.

Finish Line

AlexandraCastro

Member since: 05/29/2024

981 Reputation

44 Guides authored

0 Comments

Add Comment

View Statistics:

Past 24 Hours: 0

Past 7 Days: 0

Past 30 Days: 3

All Time: 20

test