Skip to main content

V1

Minor Versionm

by AlexandraCastro

    • 1-Uncrate the machine and remove any packing material from the interior.

    • 2-Remove from underneath any supports used to protect components during shipping.

    • 3-Install the legs at each of the three positions on the machine frame.

    • 4-Secure each leg with one nut and washer underneath the frame and another nut and washer on the inside.

    • Use a spirit level to ensure your machine is level (parallel) to the ground to ensure safety, optimum performance, and to avoid frame stress.

    • Secure your machine to adjoining equipment to prevent unexpected movement during its operation.

  1. To prevent unexpected machine cycling, depress the stop button to the off position before connecting an air supply to your machine.
    • To prevent unexpected machine cycling, depress the stop button to the off position before connecting an air supply to your machine.

    • 1-Connect a dedicated air supply to your machine or an air supply from adjoining equipment.

    • Note: The supply must be clean factory air and must be lubricated by the unit on the machine.

    • 2-Air pressure should be set to 80 psi for most applications with a minimum setting of 65 psi and maximum of 100 psi.

Finish Line

AlexandraCastro

Member since: 05/29/2024

981 Reputation

44 Guides authored

0 Comments

Add Comment

View Statistics:

Past 24 Hours: 0

Past 7 Days: 0

Past 30 Days: 0

All Time: 4

test